Problem

It takes Fena Tailoring 2hr of cutting and 4hr of sewing to make a tiered silk organza bridal dress. It takes 4hr of cutting and 2hr of sewing to make a lace sheath bridal dress. The shop has at most 16hr per week available for cutting and at most 20hr per week for sewing. The profit is $304 on an organza dress and $221 on a lace dress. How many of each kind of bridal dress should be made each week in order to maximize profit? What is the maximum profit?
The shop should make organza dresses and lace dresses to yield a maximum profit of $.

Answer

Expert–verified
Hide Steps
Answer

This will yield a maximum profit of 1658.

Steps

Step 1 :This problem is a linear programming problem. We need to maximize the profit function subject to the constraints of cutting and sewing time.

Step 2 :The profit function is 304x+221y, where x is the number of organza dresses and y is the number of lace dresses.

Step 3 :The constraints are 2x+4y16 (cutting time) and 4x+2y20 (sewing time). We also have the non-negativity constraints x0 and y0.

Step 4 :By solving this linear programming problem, we find that the optimal solution is to make 4 organza dresses and 2 lace dresses per week.

Step 5 :This will yield a maximum profit of 1658.